Going solar safely -- what to know before signing.

Three real engineering concerns govern rooftop solar interconnection anywhere in the world: anti-islanding, voltage rise on the feeder, and reverse power flow at the local transformer. Each is genuine. Each has been a solved problem in certified equipment for over a decade -- modern grid-tied inverters handle all three automatically, in software, on every install.

What's left is process. The Net Metering application protects everyone when it runs to spec; it costs homeowners weeks when it doesn't. This page walks through the engineering so you understand what you're being asked, lays out exactly what to put in your application packet, and points to what the law gives you if the process drags.

Run the full lookup for your roof →

Why interconnection rules exist at all

Most homes were wired to receive power. They aren't designed to push power back into the network. When rooftop solar exceeds household consumption, the surplus current flows backward, up the service drop, into the secondary distribution wires, and onto the local low-voltage transformer. Three concrete physics problems follow.

1. Anti-islanding (the lineman problem)

When a feeder fault trips and the grid drops, an unprotected solar inverter can keep generating, energizing the supposedly-dead line that a Meralco lineman is about to touch. This is the deadliest failure mode for distributed solar anywhere in the world.

The fix is well understood: every grid-tied inverter sold in the last decade implements anti-islanding protection. The inverter watches voltage and frequency on the line and if either drifts outside narrow tolerances (per IEEE 1547 in the US, PEC 2017 Article 6.90 in the Philippines), it disconnects within 2 seconds. Properly certified inverters are safe. The risk is unbranded gear and DIY installs that skip these standards.

What to look for: the inverter datasheet must explicitly cite IEEE 1547, UL 1741, or VDE-AR-N 4105 anti-islanding compliance. If it doesn't, treat that as a hard no.

2. Voltage rise on the feeder end

Distribution feeders are designed for power to flow downstream from the substation to the customer. As current passes through copper, voltage drops along the way (typical PH residential service: ~230V at the house, ~240V at the transformer). Solar inverts that direction: power flows upstream, and voltage rises at the house.

PEC 2017 caps household voltage at +5%/-5% of nominal (218-242V range). One small install rarely tips this. Twenty installs on the same feeder, all generating simultaneously at noon, easily can. Voltage above 252V starts damaging appliances and triggers mass inverter trip-offs (which then cause oscillation as inverters reconnect and trip again). Meralco has documented this on their own feeders.

3. Reverse power flow at the transformer

A typical PH residential pole-mounted transformer is sized 25-50 kVA and serves 30-50 homes. It's optimized for forward current -- primary side feeding secondary side. Sustained reverse current (when noon solar exceeds the served homes' load) wasn't part of the design envelope.

The widely-accepted rule of thumb in distribution planning: when distributed generation exceeds 15% of feeder peak load, the utility runs a hosting-capacity study. Past 50%, transformer derating or upgrades become necessary. Past 100%, you're exporting through the transformer in the wrong direction at thermal levels it wasn't built for.

What "registered" means and why it matters

The Net Metering Program (under DOE Department Circular 2013-05-0009 as amended) is the legal pathway for residential and small commercial rooftop solar up to 100 kW. Each of the 5 steps has a specific engineering function:

  1. Application + technical documents. Includes inverter datasheet (proves anti-islanding), single-line diagram, panel layout. Engineering review screens for pre-vetted inverter brands.
  2. Pre-installation inspection. Confirms your service drop and panel can handle bidirectional flow. Catches DIY mistakes before they become hazards.
  3. Hosting-capacity check. The utility evaluates the local feeder's existing distributed-generation load. If your install would push the feeder past safe thresholds (commonly 15% feeder peak), the response is to downsize the approval, request inverter curtailment, or require feeder upgrades. This is also the step where neighbors with existing solar affect what you can size -- and vice versa.
  4. Bi-directional meter installation. Replaces the standard meter with one that records import and export separately.
  5. Commissioning. A utility engineer witnesses the first inverter start-up and verifies anti-islanding behavior under simulated fault.

Skipping registration ("guerrilla solar") doesn't make installation cheaper, it removes the engineering review. A registered install on the same feeder as ten unregistered ones still inherits all their voltage and reverse-flow problems, with no pathway to fix them.

If your application is delayed or denied

The Net Metering process has statutory timelines. A complete application -- inverter datasheet citing IEEE 1547, single-line diagram, panel layout, system sized below 12-month daytime average -- has specific paths if it stalls.

Keep timestamps on everything. Email is preferable to phone calls for the audit trail. Verbal grid-saturation concerns should be requested in writing with the hosting-capacity study referenced by date.

Safe installation checklist

Your neighborhood's saturation, measured from satellite

We took the 280 high-confidence rooftop-solar detections our computer-vision survey identified across Greater Metro Manila (methodology), then ran SAM panel segmentation + OSM building intersection to get 384 distinct OSM buildings with detected solar, totaling about 69.9 MWp (commercial / industrial / public-purpose only; residential rooftops are aggregated to counts per /privacy). From those installs we computed a per-240m-cell saturation index: how many existing panels and how much installed kWp sit within 300m of every point.

Three tiers, defined by both panel count and installed capacity within 300m:

Limits: the index measures visible rooftop solar. Carport, ground-mount, and BIPV at this resolution may be missed. Cells in industrial-zoned areas show up "saturated" because of one or two mega-installs (e.g., the 1.5 MW SM rooftop drives all surrounding 240m cells red); for those, the saturation flag is engineering-correct, but the implication for an adjacent home is that you share a feeder with a major commercial generator, which still warrants the hosting-capacity check.

Look up your address

The main tool already wires the saturation index into the result page: type your address and you get the saturation tier, the panel and kWp counts in your 300m halo, and a tier-specific recommendation. Below the saturation card you'll see whether your specific OSM building already has detected panels.

NCR cities by detected installed solar

This is what the satellite scan and our v2.1 building-level localization actually see, by city. Counts are: high = high-confidence tile detections (CNN score ≥ 0.85), candidate = lower-confidence (0.70–0.85), bldg = unique OSM buildings the SAM panel-segmentation step matched. kWp is the sum of building-level kWp estimates within each city.

city high candidate buildings kWp installed
Quezon City 27 62 54 10,380
Valenzuela 14 24 25 4,263
Malabon 5 3 18 3,430
Paranaque 6 20 23 2,454
Taguig 7 9 6 2,225
Bacoor 6 3 8 1,946
Pasay 4 19 8 1,931
Bulacan 8 11 19 1,843
Las Pinas 5 6 3 1,780
Antipolo 2 1 2 1,654
Manila 7 30 12 1,573
Marikina 3 5 16 1,354
Pasig 5 23 17 1,349
Meycauayan 5 10 10 1,109
Navotas 3 2 4 1,027

Caveats: Esri imagery in PH is 1-3 years stale, so installs from 2024-2026 may not be visible. Cities with low kWp may simply have most of their solar outside the imagery window, not absent. Quezon City leads by a wide margin in absolute terms; per-square-km, Valenzuela and Malabon are denser.

See the map

The city map overlays the per-tile detection circles (high vs candidate) and per-building panel polygons on top of the city-level composite signal. Click a polygon to see the building's OSM ID, type, kWp, and confidence.

Sources